How long does the permit process take?
Permits that are turned in with the correct paperwork have a 72 hour turn around time. If the building inspector determines that more information is needed, you will be notified as soon as possible.
Permits that are turned in with the correct paperwork have a 72 hour turn around time. If the building inspector determines that more information is needed, you will be notified as soon as possible.